Reducing yield loss in steel plants with better data

Short answerYield loss in an integrated steel plant is the gap between material fed into a stage and usable output from it, across sinter, pellet, DRI, steel melting and rolling. It often goes unnoticed because each stage reports separately and too late. Capturing input and output per stage every shift, comparing them with norms, and alerting on deviations the same day makes losses visible while they can still be acted on.

Where yield is measured

StageInputOutput
Sinter or pelletFines, fluxes, fuelSinter or pellets
DRIOre or pellets, coalSponge iron
Steel meltingSponge iron, scrap, hot metalLiquid steel, billets
RollingBilletsFinished products

Making losses visible

  • Shift-wise input and output entry
  • Consistent material codes and units
  • Norms per stage and product
  • Same-day deviation alerts
  • Weekly review of top loss causes

Frequently asked

Can yield be tracked without new instruments?

Yes. Most plants can start with existing weighbridge and production records, then add instrumentation where it adds most value.

See how much faster your operations could run

Book a 30-minute demo, or ask for a free assessment of your current processes. You will speak with someone who builds the software, not a call centre.

Book a demo

Tell us what you need. We reply within one business day with a demo slot.

Add project details (optional, helps us prepare)

We use your details only to respond to this request. See our privacy policy.